UL Listed vs FM Approved: What the Inspector Is Really Asking

by | Standards and Service

Comparison table of UL listing and FM Approval by who issues it, what is tested, who asks for it and the correct wording

UL listed and FM Approved are separate certifications from separate organizations, and neither implies the other. UL (Underwriters Laboratories) tests products against published UL standards and lists the ones that pass; for pre-engineered dry chemical units the standard is UL 1254. FM Approvals is the certification arm of the FM Global insurance group and tests against FM standards that reflect the insurer's own loss experience. An inspector asking "is it UL or FM?" is usually asking one of two narrower questions: does the unit carry a listing the adopted code and the authority having jurisdiction recognize, or the mark the site's property insurer wrote into its requirements. Find out which before you answer.

What UL 1254 actually tests on a dry chemical unit

A UL listing to UL 1254 covers the unit as a complete pre-engineered package: the agent tank, the expellant gas supply, the hose, the nozzle and the specific agent fill, tested together at the manufacturer's stated capacity and flow. Testing covers discharge for rated time and throughput, fire performance against the rated hazard, pressure and burst on vessel, hose and fittings, and exposure to corrosion, vibration and temperature extremes. Follow-up inspection at the factory keeps the mark honest, and it holds only on units built the way the listed sample was. Swap the nozzle for an unlisted equivalent in the field and the listing no longer applies.

For the model codes this is the mark that matters. NFPA 17 requires pre-engineered dry chemical systems to be installed in accordance with their listing, and the International Fire Code references NFPA 17 for dry chemical. A fire marshal reviewing a skid on a loading rack therefore looks for the UL mark, the listing number and an installation that matches the listed manual. An unlisted unit becomes an engineered system to be justified on its own evidence, which is a longer conversation.

Need the listing documents for a submittal? Request them from Salus.

What FM approval adds, and who asks for it

FM tests to its own standards, some of which are stricter than UL's or cover criteria UL does not test at all. FM also issues Property Loss Prevention Data Sheets, design guides that FM-insured facilities are expected to follow. A site insured by FM Global, or by a carrier that adopts FM's data sheets, may be required by contract to use FM Approved fixed fire protection equipment, and the carrier's field engineer will check during risk surveys. An insurer's engineer will not take a UL mark as proof of FM approval.

Code language muddies this, and it is worth clearing up before the conversation with the inspector. NFPA defines "approved" as acceptable to the authority having jurisdiction, and "listed" as included in a list published by an organization acceptable to that authority. Read strictly, an FM Approved product is listed in NFPA's sense, and the only body that approves anything is the AHJ standing in front of you. OSHA recognizes both UL and FM Approvals as Nationally Recognized Testing Laboratories, so an inspector has grounds to accept either mark unless the adopted code or the specification names one.

The two marks answer to different people. UL is about code compliance and the permit; FM is about the insurance recommendation and, in some cases, the premium. Plenty of acceptable equipment carries only one. Salus Global dry chemical skids are UL listed to UL 1254; if a specification calls for FM approval, have that conversation with the insurer's engineer before the order rather than after delivery, because an insurer will often accept a UL listed unit with a documented deviation, and sometimes will not.

How to answer the inspector in one sentence

Have three documents ready for any listed unit: the listing certificate or the UL Product iQ entry showing the listing number and model designation, the manufacturer's installation and maintenance manual that the listing references, and the nameplate photograph showing the UL mark and serial number on the unit itself. The answer to "UL or FM?" then becomes "UL listed to UL 1254, listing number on the nameplate, installed per the listed manual, here is the certificate." If the site carries an insurance requirement, add that the carrier has reviewed the data sheet, with the email to prove it.

Knowing what not to say helps too. Describing a unit as approved by UL marks the speaker as unfamiliar with the process; UL lists, FM approves. A letter from a distributor saying a product "meets UL 1254" without a listing number means it was not tested by UL, whatever its merits. And a listing on a 350 lb unit does not carry over to a 1,000 lb unit from the same maker unless the larger model appears on the listing, worth checking when a skid is being scaled up to a bigger hazard.

Request the listing documents

Send us the model you are specifying and we will return the UL listing certificate, the data sheet and the installation manual.

Request documents Request a quote

Download Brochure

    Download Brochure

      Please fill the form

        Please fill the form

          Download Brochure

            Download Brochure

              Please fill the form

                Please fill the form

                  Download Brochure

                    Download Brochure

                      Talk To Our Expert

                        Tom Reser
                        40+ Years Industry Experience UL/FM Pump Specialist

                          Talk To Our Expert
                          Please fill the form

                            Please fill the form

                              Get In Touch With Us